I. before set up: put together properly, choose the right region & tools
First, determine the set up vicinity: prioritize nicely-ventilated spaces (such as kitchens, gadget rooms), avoid sinks and flammable substances (consisting of curtains, timber fixtures), and location it 1.2-1.five meters above the ground for smooth operation and preservation. Then prepare equipment: a professional device kit (inclusive of an electric powered drill, wrench, stage, gasoline leak detector) is needed. at the same time, take a look at whether or not the boiler accessories (flue, water pipe, fuel pipe, growth screws) are complete, and ensure the accessories in shape the boiler model (e.g., the flue diameter have to meet the necessities of the boiler body).
II. middle set up: repair the Boiler & connect Pipes, comply with requirements Strictly
Step 1: fix the boiler frame: Use a stage to calibrate the set up wall, mark the drilling positions, drill holes with an electric drill, insert enlargement screws, restoration the boiler putting plate on the wall, then grasp the boiler frame on the hanging plate to make sure the body is vertical without tilting. Step 2: join the pipes: The fuel pipe need to use a special stainless-steel corrugated pipe (everyday rubber pipes are prohibited); the water pipes (inlet pipe, outlet pipe) ought to be wrapped with uncooked tape to save you water leakage; the flue should amplify exterior (the out of doors phase is willing downward by means of 5° to avoid rainwater backflow), and the distance among the flue and the wall should be sealed with fireproof putty.
III. safety Commissioning: test & test earlier than Powering On & Venting
First, perform air tightness take a look at: turn off the boiler valve, use a gasoline leak detector to check the fuel pipe interface, or apply soapy water (if bubbles appear, it shows a leak and needs to be resealed). Then test the water circuit: Open the water inlet valve, drain the air in the pipeline, and have a look at whether the water pipe interface leaks. eventually, commission with electricity and gasoline: switch on the electricity and fuel valve, start the boiler in keeping with the manual, test whether the ignition and heating functions are everyday, and take a look at whether or not the air pressure transfer and protection valve are sensitive.
IV. After installation: confirm info to keep away from Hidden risks
3 tests are required after set up: First, flue set up: verify that the outdoor cease of the flue is unobstructed (which includes branches, partitions) and fixed firmly (to save you falling off due to wind). second, electric safety: make sure the electricity twine is properly grounded and maintains a distance of more than 30cm from the gasoline pipe and water pipe. third, utilization instructions: give an explanation for fundamental operations (along with adjusting temperature, water replenishment technique) and emergency shutdown steps (consisting of ultimate the gasoline valve and ventilating in case of gasoline leakage) to the consumer, and retain the installation certificate and after-sales contact statistics.